Gocarbonpro

Services & tools

Everything E⁴ engine does, in one place.

Fast, private, carbon answers for anyone working in BIM from a first score to a shareable report.

Live today

Included with every subscription. Explore the sample models before you choose a plan.

Stages A1–A5

Instant IFC assessment

Drop in the IFC file you already export from Revit. E⁴ reads it in your browser elements, materials and volumes and returns an A1–A5 embodied-carbon score in seconds. Your file is never uploaded.

xlsx · xls · csv

Excel & CSV schedules

No model? Upload a Revit Material Takeoff or any material schedule (Excel or CSV). E⁴ finds the material and quantity columns for you and runs the same assessment.

EN 15978 aligned

A++–G rating & intensity

Every assessment gets a clear letter rating and a carbon intensity in kgCO₂e/m², so you can see at a glance where your design stands.

Top-8 materials

Charts & carbon hotspots

Pie and bar charts break your footprint down by life-cycle stage and by material, so you know exactly which elements to change for the biggest cut.

Any city

Climate Advisor

Enter your project's city and E⁴ pulls live weather data average and extreme temperatures, rainfall then suggests materials and measures that suit that climate and lift your rating.

Print-ready

PDF reports

Export a clean, professional PDF of every assessment totals, stages, charts, hotspots and rating ready to share with clients or your team.

Actionable

Improvement guidance

Beyond the score: every report points at the materials driving your footprint and shows what moving them could do to your rating.

Live

What-if material swaps

Swap concrete for CLT, low-carbon concrete or recycled steel right inside a report and watch the total, carbon saved and rating update live.

Live

Early-stage estimate

No model yet? Pick a building type and floor area to get a typical carbon range before design starts.

Early screening vs full LCA

Gocarbonpro steers early design choices in seconds complementing certified Life Cycle Assessment, not replacing them.

E⁴ screeningFull LCA
ScopeUpfront A1–A5Cradle to grave, A–C (+ D)
Input dataBIM quantities + generic factorsProduct EPDs + bills of quantities
TurnaroundSeconds, in your browserTypically weeks of consultancy
PurposeFast design optioneeringCompliance and certification

Coming next

On the roadmap

Gocarbonpro is growing fast. Here's what we're building tell us which one you want first.

Design version comparison

Compare two exports of the same project side by side and see exactly how many tonnes each design change saved.

Shareable report links

A public link to any finished report — clients open it without an account, branded E⁴.

Team accounts for firms

One dashboard for a whole practice: every project, every architect, every iteration in one place.

Replacements (B4)

Replacement cycles over a 50-year study period, shown as their own line next to end of life (C1–C4).

Ready when you are

Your next export is a carbon report away.

Drop in an IFC or a schedule and see your rating in seconds.

Start an assessment