Gocarbonpro

About

Giving every designer the power to build a sustainable world

Ahmed Khan presenting

FOUNDER · GoCarbonPro (Powered by E⁴)

Ahmed Khan

Why I built Gocarbonpro

Carbon is becoming a project requirement. Most firms aren't ready. Clients, investors and regulators across Europe now expect AEC firms to know the carbon of what they design. From 2028, whole-life carbon disclosure becomes part of delivering new buildings over 1,000 m², and from 2030 every new building.

Yet for most practices, carbon still arrives at the end of a project. A full life-cycle assessment is commissioned once the design is done. It can take weeks, it needs a specialist, and by the time the number lands, changing course means redesign, delay and cost. Teams are left reporting a result they never had the chance to improve.

That gap is the problem we set out to solve. Gocarbonpro gives AEC teams a carbon answer at design stage, in seconds, inside the workflow they already use. Your team sees where a project's carbon sits and what an alternative would save, while decisions are still cheap to make.

Every figure is traceable to public, versioned data, so results can be shared with clients and checked by anyone. It doesn't replace a certified LCA. It makes sure that when the LCA comes, there are no surprises. The result: faster design decisions, fewer late changes and a clear carbon story for every client.

Know your project's carbon before it's too late.

The problem Gocarbonpro is solving

~11% of global emissions

Building materials and construction account for roughly a tenth of global energy-related CO₂ (WorldGBC).

Locked in early

Most embodied carbon is fixed by concept-stage choices of structure and materials, before a full LCA usually starts.

Weeks vs. seconds

A full LCA often takes weeks at technical design; E⁴ screens design options in seconds at early stages.

Cannot be undone

Unlike operational energy, upfront carbon is emitted before handover and cannot be fixed later with green tariffs.

WHAT GOCARBONPRO DOES TODAY

A lot has been added since that first score.

E⁴ started as a single idea instant carbon from a BIM model and has grown into a full toolkit. Everything below is live on the platform right now.

Instant IFC assessment

A1–A5

Drop in the IFC file you already export from Revit: elements, materials and volumes are read in your browser and an A1–A5 score comes back in seconds. Files are never uploaded.

Excel & CSV schedules

New

No model handy? A Revit Material Takeoff or any material schedule works too: E⁴ finds the material and quantity columns and runs the same assessment.

A++–G rating & intensity

At a glance

Every assessment gets a clear letter rating and a carbon intensity in kgCO₂e/m², aligned with EN 15978 life-cycle stages.

Charts & carbon hotspots

Visual

Pie and bar charts break the footprint down by life-cycle stage and by material, with numbers, so you know exactly what to change.

Climate Advisor

AI-powered

Enter your project's city and E⁴ pulls real weather data (average and extreme temperatures, rainfall), then suggests materials and measures that suit that climate and lift your rating.

What-if material swaps

New

Swap concrete for low-carbon concrete, CLT or recycled steel right inside a report and watch the total, carbon saved and rating update live.

Early-stage estimate

New

No design yet? Pick a building type, structure and floor area to get an indicative carbon range before any model exists.

Branded PDF reports

Print-ready

Export a clean, E⁴-branded PDF of every assessment: totals, stages, charts, hotspots and rating, ready to share with clients.

Learn hub

Free

A growing library of plain-language guides: embodied carbon, stages A1–A5, EPDs, how ratings work, and how to read your report.

And it keeps growing

Roadmap

Coming next: shareable report links, design version comparison, team accounts for firms, and life-cycle stages B & C. Tell me which one you want first.

What E⁴ is not

Screening-level estimate

E⁴ is built to be honest about what it is. So, clearly:

  • Not a certified whole-building LCA. It is a fast, screening-level assessment built on typical factors, not product-specific EPDs.
  • Not a legal compliance tool. It does not replace a verified assessment required for certification schemes or regulation.
  • Not finished. Whole-life stages B and C, shareable links and team accounts are on the roadmap.

Questions, answered

Frequently asked questions.

Short, plain answers about how E⁴ works, what it covers and what it does not claim to be.