A life-cycle assessment (LCA) divides a building's life into standardised stages defined by EN 15978. The stages E⁴ assesses are A1 to A5, often called 'cradle to practical completion'.
A1–A3 · Product stage
Everything up to the factory gate: extracting raw materials (A1), transporting them to the manufacturer (A2), and manufacturing the product (A3). For most buildings this is by far the largest share of embodied carbon: cement, steel and aluminium are the usual hotspots.
A4 · Transport
Moving products from the factory to the building site. E⁴ estimates this from the mass of each material and an assumed road-transport distance, which you can set per assessment.
A5 · Construction
What happens on site: material wastage (offcuts, over-ordering, damage) plus the energy and fuel used by site activities. E⁴ models wastage per material and adds a per-square-metre allowance for site operations.
What about B and C?
Stages B cover the building in use (maintenance, replacement, operational energy) and C covers end of life (demolition, disposal, recycling). E⁴ currently focuses on A1–A5 because that is where design decisions lock in the most carbon, earliest. Stages B and C are on our roadmap.